Spit Hit 8x40mm EN08X40

5.18

1000 in stock

SKU: CHNBNEN08X40 Categories: ,
Description

Upgrade your fastening solutions with the Spit HIT M 8x40mm Hammer Fixing, engineered for fast, reliable, and secure installations across a wide range of building materials. Designed with professionals in mind, this high-performance fixing combines a durable nylon plug with a corrosion-resistant galvanized steel screw for long-lasting performance.

🔩 Key Features:

  • Quick Installation: Simply drill, insert, and hammer – no screwdriving needed.

  • Secure Hold: Expanding plug design ensures a tight grip in both solid and hollow materials.

  • Durable Materials: Nylon anchor and galvanized screw resist wear and corrosion.

  • Versatile Use: Perfect for concrete, brick, plasterboard, aerated concrete, and more.

  • Clean Finish: Flat collar prevents over-penetration and maintains a tidy look.

📏 Specifications:

  • Drill Diameter: 8 mm

  • Plug Length: 40 mm

  • Anchoring Depth: 30 mm

  • Max Fixture Thickness: 10 mm

  • Screw Head: Flat (Pozidriv PZ2)

Applications:

  • Electrical fittings

  • Drywall tracks and profiles

  • Light steel frames

  • Skirting boards

  • Insulation and cable clips

Whether you’re a contractor or a DIY enthusiast, the Spit HIT M 8x40mm offers an efficient and dependable fastening solution that won’t let you down.

Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Spit Hit 8x40mm EN08X40”

Your email address will not be published. Required fields are marked *

Shipping & Delivery

How much cost the fee of home delivery option?

Home delivery is free, if the order is greater or equal to Rs 3,500.00*. If the order value is less than Rs 3,500.00*, a delivery fee of Rs 200.00 will be applied. 

* Size limit for above is 80cmx80cmx80cm. 

For order above 5Kg and over size limit as stated above, Numelec Ltd will issue a quotation.

How long does it take for ordered products to be delivered after selecting home delivery?

The delivery time is within 3 working days after receipt of payment of the total amount due for the ordered products.